Building Renovation Progress
image_pdfimage_print

This page showcases the progress of Come And Reason Ministries’ new building renovation via time lapse videos using two Brinno TLC200s and an Afidus ATL-200 HD. (Recorded, compiled, processed, and edited by Dean Scott, mfa).

Virtual Meets Reality: 360 Interactive Pano of our New Studio

The virtual half of this image is a rendering of a 3D model created by Dean Scott, mfa, to design this and the attached control room, by placing walls, doors, windows, lights, sound panels, and fitting/designing the lighting grid and as a way to test paint colors, floor textures, and lighting simulation. The real half is a photo taken with a 360 camera. The two images were married together, showing how architectural pre-visualization greatly benefited and confirmed this ground-up remodeling project!

Part 4: August 8 – October 8, 2022

Part 3: March 24 – July 29, 2022

Part 2: December 21, 2021 – February 23, 2022

Part 1: December 6 – 17, 2021